Khalifa Port South Quaywall Works

Theme
Seaborne Trade
Client
Abu Dhabi Ports, Abu Dhabi, UAE
Status
Completed, 2019
Scope Of Work

Abu Dhabi Ports Group awarded the Khalifa Port South Quaywall Expansion works to NMDC D&M in 2019. The purpose of this project was to add 3.5km of additional quaywall length to the existing port area in preparation of receiving more ships to the port.

Workscope included:

  • Dredging & Reclamation (15 million m3)
  • Deepening of main channel
  • Construction of Gravity Quaywall 3,500m to -19m and 1,000m to -16m
  • Installation of 2,900m Sheet Piling Works.

NMDC ensured no interference with live port operations.