#51/9063
EPC for Qusahwira Field Development 1.8 MMBOPD Project.
- Theme
- Onshore
- Client
- ADCO, UAE
- Status
- Completed, 2010 - 2013 ( 46 Months )
- Contract Type
- EPC
Scope Of Work
EPC Project for development of Qusahwira Oil Field, consisting of the following facilities:
- 245 Km of Pipelines including Main Oil line, transfer lines, flow lines & water injection lines.
- Central Degassing Station (CDS), Remote Degassing Station (RDS1) & Water Inj. Clusters (WICs)-2 nos.
- Total 47 Wells - Oil producer(24), Water Supply(2), Water Disposal(7), Water Injection(5) & Gas Injection (9).
- 33 KV Overhead Transmission Lines to supply power to CDS, RDS (incl. 220 KV sub station) & WICs. dehydration, produced water treating and disposal and various supporting utilities. New 2 water injection clusters.