LTA for Eight (8) Slipover Platforms with Associated P/Ls & Cables - OOK / IK
- Theme
- Offshore
- Client
- Saudi Aramco, Saudi Arabia
- Status
- Completed, 2018 - 2021 ( 37 Months )
- Contract Type
- EPC
Scope Of Work
Engineering, Procurement, Fabrication, Transportation, Installation, Hookup and Pre-commissioning in SFNY field of:
- 8 Slipover jackets and decks in Central SFNY field which require demolition of the existing jacket and topsides.
- Installation of subsea infrastructure: 6 valve skids, 3 Rigid pipelines, 3 New Fiexibies, 6 umbilicals, 8 cables.
- Disconnection and reconnection of facilities to subsea infrastructure (SFNY-210 and SFNY-107) 2 lateral Flexible flow lines & 2 umbilicals
- Demolition of all the existing wellhead platform jackets and decks and existing pipeline demolition where required