Go Back
#8/7306/7307

LTA for Eight (8) Slipover Platforms with Associated P/Ls & Cables - OOK / IK

Theme
Offshore
Client
Saudi Aramco, Saudi Arabia
Status
Completed, 2018 - 2021 ( 37 Months )
Contract Type
EPC
Scope Of Work

Engineering, Procurement, Fabrication, Transportation, Installation, Hookup and Pre-commissioning in SFNY field of:

  • 8 Slipover jackets and decks in Central SFNY field which require demolition of the existing jacket and topsides.
  • Installation of subsea infrastructure: 6 valve skids, 3 Rigid pipelines, 3 New Fiexibies, 6 umbilicals, 8 cables.
  • Disconnection and reconnection of facilities to subsea infrastructure (SFNY-210 and SFNY-107) 2 lateral Flexible flow lines & 2 umbilicals
  • Demolition of all the existing wellhead platform jackets and decks and existing pipeline demolition where required