Go Back
#31/181

Satah Full Field Development (Offshore Part)

Theme
Onshore/Offshore
Client
ZADCO, Abu Dhabi, UAE
Status
Completed, 2011 - 2017 ( 78 Months )
Contract Type
EPC
Contract Value
493.59
Scope Of Work

Engineering, Procurement, Fabrication, Construction, Installation, Pre-commissioning and Start-up of the Plant Facilities for the project including onshore modifications and installation of new facilities on Zirku Island & a new G.D.U and DCS / SCADA modifications on Arzanah to achieve the following objectives:

  1. Injection of Satah Produced Gas along with 20 MMSCFD makeup gas from Upper Zakum.
  2. Reduction of wellhead flowing pressure.
  3. Pipelines (12", 12", 6", 10" x 131 Km)
Go Back