Satah Full Field Development (Offshore Part)
- Theme
- Onshore/Offshore
- Client
- ZADCO, UAE
- Status
- Completed, 2011 - 2017 ( 78 Months )
- Contract Type
- EPC
Scope Of Work
Engineering, Procurement, Fabrication, Construction, Installation, Pre-commissioning and Start-up of the Plant Facilities for the project including onshore modifications and installation of new facilities on Zirku Island & a new G.D.U and DCS / SCADA modifications on Arzanah to achieve the following objectives:
- Injection of Satah Produced Gas along with 20 MMSCFD makeup gas from Upper Zakum.
- Reduction of wellhead flowing pressure.
- Pipelines (12", 12", 6", 10" x 131 Km)